When configuring a Data Capture extract job, there is a limit on the duration you can select for a single job.
🔑 The maximum timespan allowed between the chosen Start Date
and End Date
for a single data extraction job is 31 days.
This means the selected End Date
must be no more than 31 days after the selected Start Date
.
💡 If you need to extract data spanning a period longer than 31 days, you will need to create multiple extract jobs. For example, to extract 60 days of data, you would typically create two consecutive 30-day or "monthly" extraction jobs.